Basit öğe kaydını göster

dc.contributor.authorZhou, Pengfei
dc.contributor.authorLuo, Jie
dc.contributor.authorCheng, Fei
dc.contributor.authorYüksel, Serhat
dc.contributor.authorDinçer, Hasan
dc.date.accessioned2021-05-20T06:50:54Z
dc.date.available2021-05-20T06:50:54Z
dc.date.issued2021en_US
dc.identifier.citationZhou, P., Luo, J., Cheng, F., Yüksel, S. ve Dinçer, H. (2021). Analysis of risk priorities for renewable energy investment projects using a hybrid IT2 hesitant fuzzy decision-making approach with alpha cuts. Energy, 224. https://dx.doi.org/10.1016/j.energy.2021.120184en_US
dc.identifier.issn0360-5442
dc.identifier.issn1873-6785
dc.identifier.urihttps://dx.doi.org/10.1016/j.energy.2021.120184
dc.identifier.urihttps://hdl.handle.net/20.500.12511/6851
dc.description.abstractThe aim of this study is to identify significant risks for the renewable energy investment projects. In this regard, a novel hybrid multi-criteria decision-making (MCDM) model has been proposed based on hesitant linguistic terms and alpha level sets. This model has three different phases. Firstly, the dimensions and criteria are defined regarding the renewable energy investment risks. In the second part, the significance levels of these factors are calculated with the help of hesitant interval type-2 fuzzy (IT2F) DEMATEL-based ANP (DANP). Finally, the types of investors by the risk awareness entitled high, moderate, and low are ranked while using hesitant IT2F QUALIFLEX. In all analysis, alpha level sets are taken into consideration. The results demonstrate that organizational effectiveness and cost efficiency are the most prominent factors for renewable energy investment. On the other side, moderate risk should be taken in these projects. It is recommended that the departments within the company should be compatible with each other for the renewable energy investment projects to be more successful. For this purpose, necessary actions should be taken to improve communication between departments. Another important point is that cost control should be done effectively to contribute to the performance of the renewable energy investment projects.en_US
dc.language.isoengen_US
dc.publisherPergamon-Elsevier Science Ltden_US
dc.rightsinfo:eu-repo/semantics/embargoedAccessen_US
dc.subjectRenewable Energy Investmenten_US
dc.subjectRisk Analysisen_US
dc.subjectDANPen_US
dc.subjectQUALIFLEXen_US
dc.subjectIT2 Fuzzy Logicen_US
dc.titleAnalysis of risk priorities for renewable energy investment projects using a hybrid IT2 hesitant fuzzy decision-making approach with alpha cutsen_US
dc.typearticleen_US
dc.relation.ispartofEnergyen_US
dc.departmentİstanbul Medipol Üniversitesi, İşletme ve Yönetim Bilimleri Fakültesi, Uluslararası Ticaret ve Finansman Bölümüen_US
dc.authorid0000-0002-9858-1266en_US
dc.authorid0000-0002-8072-031Xen_US
dc.identifier.volume224en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.identifier.doi10.1016/j.energy.2021.120184en_US
dc.identifier.wosqualityQ1en_US
dc.identifier.scopusqualityQ1en_US


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster